You will watch the machine print well at your supplier's factory. That is not the question you are there to answer. The question is whether the same machine will still print in register in your plant, in week three, on your bottles, on your power supply, with the operator you actually employ.
A pre-shipment inspection is the last moment when a problem is still cheap. Once the crate is closed and the balance is paid, every defect becomes a freight claim, a spare-parts order and a delay you cannot recover. This checklist is written for buyers of automatic and semi-automatic screen printing machines, and it is designed to be printed, filled in by hand and signed by both sides.
One rule before anything else: inspect against a written spec, not against your impressions. A machine that looks well built and prints a nice sample on the supplier's own bottle tells you very little. A machine that meets numbered criteria on your own bottle tells you almost everything.
What a pre-shipment inspection can and cannot prove
Be clear about the scope, otherwise you will either over-trust the report or demand the wrong tests.
It can prove: the configuration matches your purchase order, your bottle geometries actually load and print, the artwork registers within your tolerance over a stated sample, the electrical build matches your plant, guards and interlocks work, the spare-parts kit is complete, and the packing will survive a sea container.
It cannot prove: reliability over a year of production, wear behaviour of grippers and pads, long-run reject rate, or how the machine behaves with an inexperienced operator at 2 a.m. Those are covered by the factory acceptance test, the warranty terms and the spares kit — not by a two-hour visual inspection.
So treat inspection as a conformance exercise: does this machine match what was agreed, and does it print my job within my tolerance today? Leave long-run performance to a written FAT protocol and a warranty clause.
Step 0: agree the inspection protocol before you pay the deposit
The most common failure is not a bad machine. It is a good argument after the fact, because nobody wrote down what "pass" meant. Before the deposit, send your supplier the protocol you intend to use — the table below is enough — and ask them to confirm it. Suppliers who build seriously will accept a numbered protocol. It also protects them: a signed protocol is evidence that the machine left in agreed condition.
For a bottle printing line, keep the protocol tied to the machine you are actually buying, not to a generic brochure. If you are still choosing between a dedicated bottle printer and a multi-purpose unit, our overview of the plastic bottle screen printing machine range is the right place to fix the configuration before you write the protocol.
The pre-shipment inspection checklist
Work through the items in order. For each one, write what you saw, not that you saw it — a number, a photo filename, a sample ID. A checklist without recorded evidence cannot be used in a dispute.
| # | What to check | How to verify it | Record |
|---|---|---|---|
| 1 | Configuration vs purchase order | Count print stations, colours, UV or IR curing, flame or plasma unit, loading and unloading method, optional jigs | Serial number + photo of nameplate |
| 2 | Bottle handling range | Load 30 pieces of each of your own SKUs, smallest and largest diameter, shortest and longest body | Bottle size list actually run |
| 3 | Registration on your artwork | Print 10 consecutive bottles, measure the print position against a datum on each | Max deviation in mm per colour |
| 4 | Print quality on your material | Check coverage, pinholes, edge definition and ink adhesion on your actual PP, PE, PET or glass | Photo of best and typical print |
| 5 | Surface treatment | Confirm the flame or plasma unit is fitted, adjustable and used in the test print — not bypassed | Photo of unit in operation |
| 6 | Curing | UV lamp hour counter, shutter operation, or IR tunnel set temperature with your ink | Lamp hours and set values |
| 7 | Electrical build | Voltage, phase, frequency, earthing, breaker rating, control-transformer taps, wire labelling | Photo of nameplate and panel |
| 8 | Pneumatics | Air pressure at the machine, consumption at rated cycle, filter-regulator condition, leak check | Pressure reading and cycle count |
| 9 | Safety devices | E-stop, guards, interlocks, two-hand start if fitted — test each one physically | Pass/fail per device |
| 10 | Controls and recipes | HMI language, recipe save and recall, parameter backup file handed over, alarm list explained | Screenshot of recipe screen |
| 11 | Spare parts and wear kit | Compare box contents against the list, item by item; check part numbers appear in the manual | Signed packing list |
| 12 | Documentation and packing | Operation manual, electrical diagram, mechanical drawings, crate photos, loading photos with container seal | Document set + photo set |
Items 3 and 4 are the ones buyers skip and later regret. Configuration errors can be corrected after arrival with an argument and a payment. A machine that cannot hold register on your oval bottle cannot be corrected on site at all.
Print tests to demand, not watch
Watching a demonstration is passive. Ask for three runs with your own bottles, your own screens and your own ink, and ask that the rejects be kept on the table rather than quietly removed.
- Run 1 — registration: print a layout with a clear datum line, then measure offset on 10 consecutive bottles. Record the maximum, not the average. Average hides the one bottle that fails downstream.
- Run 2 — adhesion: print your hardest substrate. If it is untreated PP or PE, ask to see the same print with and without flame treatment, so you know the treatment is doing work rather than being decorative.
- Run 3 — changeover: ask them to change from your SKU A to SKU B while you time it, including screen change, registration and first-off approval. This number decides whether short runs are viable for you.
Use a simple record sheet so the three tests produce comparable numbers. The figures below are an illustrative example only — replace every value with the tolerance taken from your own artwork specification.
| Test | Sample | What is recorded | Illustrative pass criterion |
|---|---|---|---|
| Registration | 10 bottles, colour 1 | Max offset from datum | Within artwork tolerance as agreed, e.g. ±0.5 mm (illustrative) |
| Adhesion | 5 bottles | Cross-hatch or tape pull result | No ink lift after the agreed test (illustrative) |
| Changeover | 1 change, timed | Minutes from last good part to next first-off | At or under the figure agreed in the order (illustrative) |
| Output | 10 minutes continuous | Good units, stops, causes | Stated rate × agreed efficiency factor (illustrative) |
Electrical and utility verification for your own plant
This is where imported machines most often stall on arrival. A machine built for one grid does not necessarily run on another without a decision made before shipping.
Write your plant's real values on the protocol and compare them with the nameplate: voltage (for example 380 V, 415 V or 440 V three-phase, or 220 V single-phase), frequency (50 or 60 Hz), and the actual measured voltage at your socket rather than the nominal figure. Then confirm three things with the supplier:
- Transformer taps or motor connection — whether the machine can be re-tapped on site, and by whom.
- Control circuit voltage — a machine whose controls run on a different voltage than your plant may need an external transformer; that is a purchase, not an adjustment.
- Frequency-sensitive parts — motors, pumps and timers behave differently at 60 Hz, and the supplier should state which components are affected.
Ask the same about air: what pressure and flow the machine needs at rated cycle, and whether your compressor and receiver can hold it during continuous operation. Most pneumatic screen printers work in a moderate pressure band, but the number that matters is the one on the drawing for your machine. If your unit is servo-driven rather than pneumatic, the air question shrinks and the electrical question grows — the High-Accuracy Servo Control Automatic Screen Printing Machine is a useful reference point for how the two builds differ in what you must prepare.
Spares, wear parts and first-run consumables
A machine that arrives without its wear parts is a machine that stops on day nine. Inspect the kit physically rather than accepting a promise:
- Squeegee blades and flood bar, in the hardness you actually print with
- Screen frames or clamps, and the frame size the machine accepts
- Grippers, mandrels, pads and fixtures in your bottle sizes
- Belts, sensors, proximity switches, fuses and seals
- Enough ink, thinner and cleaning solvent for the first production run
Ask for a two-year wear-item price list with part numbers at the same time. It costs the supplier nothing and it turns your maintenance budget from a guess into a number.
Packing, crating and shipping evidence
Inspection ends at the crate, not at the print. Photograph the machine strapped to the crate base, rust-preventive coating on bare metal, desiccant quantity, and every accessory box with its label. If the crate is timber, confirm the treatment marking your country requires. Ask for container loading photos including the door and the seal number, and confirm the Incoterm in writing before the truck arrives — the difference between FOB and DDP is a cost you discover at customs otherwise.
Remote inspection when you cannot travel
Most buyers cannot fly to every factory, and that is workable if you control the video instead of watching a tour.
- Send the checklist in advance and ask for the tests in that order, live.
- Ask for one continuous, unedited cycle from bottle loading to unloading. Edited clips hide the stops that matter.
- Have the operator measure registration on camera with a rule against the datum, and read the number aloud.
- Photograph the nameplate and serial number, and compare them with the documents.
- Keep the recording. It is the most useful evidence you will have if a fault appears in month two.
Sign-off, punch list and what to do when something fails
A useful inspection report has four parts: what was checked, what the measured value was, what deviates from the agreed spec, and who will fix it by when. Anything that fails goes onto a punch list with a re-test date.
Commercially, the strongest position is to inspect before the balance payment, or to hold a retention against punch-list closure until re-test. This is a normal request when the protocol was agreed up front. If a deviation is structural — wrong configuration, a machine that will not hold register on your bottle, an electrical build that cannot run on your grid — do not accept a promise to fix it after arrival. Get the re-test date in writing and keep the machine at the factory until it passes.
If the machine passes inspection but prints disappointingly in your first production week, the cause is usually material batch, treatment setting or ink, not the machine. Our screen printing machine troubleshooting and repair guide works through those causes in the order worth checking.
FAQ
How long does a pre-shipment inspection take?
For a single-colour bottle printer, plan on a half day including print tests and a changeover. Multi-colour machines with curing and a training session need a full day. Agree the duration with the supplier when you book it, because a rushed inspection skips exactly the print tests that matter.
Should the inspection happen before or after the balance payment?
Before, or with a retention held against the punch list. Inspection after full payment is still better than none, but you lose the strongest lever you have: the machine staying at the factory until it conforms.
Can a third-party inspection company do this for me?
Yes for the mechanical, electrical and packing items — those are standard. Third-party inspectors usually cannot judge print registration, ink adhesion or changeover economics, because that requires your artwork and your substrate. Give them your protocol and run the print tests yourself by video.
What documents should I receive with the machine?
Operation manual in a language your team reads, electrical diagram, mechanical drawings with part numbers, spare-parts list, parameter backup file, and a signed inspection report with the measured values. Missing documents are the most common post-arrival complaint, and the cheapest to fix before the crate closes.
Next step
Send us your bottle sizes, artwork tolerance, colour count and plant voltage, and we will return a filled-in inspection protocol for the model that fits your job — including the print tests and the spares list, ready to send to the factory. If you are buying an automatic line, the specification baseline for the CNC Bottle Automatic Screen Printing Machine is the right starting point for a protocol that matches the machine you will actually receive.